Every step from first test to inspection-ready, measured the same way every time.

Three roadmaps, one for each CLIA level. Each one is a set of gated phases with a clear objective, who does what, what you receive, and exit criteria you can check off with evidence. No phase is "done" because someone says so. It is done when the record exists.

Which roadmap applies to you?

Check everything your lab does now or plans to do in the next 12 months. The highest level you check sets your roadmap.

Your result appears here.

One lifecycle, three levels of depth

Every roadmap follows the same stages. Higher complexity adds phases and raises the bar at each gate. Phase codes link the stages to each roadmap.

StageWaivedModerateHigh
Classify and baselineEvery test categorized; current state scored on evidence.W0, W2M0H0
Certificate and licensureLegally authorized before the first patient result.W1M2H2
PeopleEvery CLIA role filled by a qualified, documented person.n/aM1H1
DocumentsApproved procedures and a quality system.W3M3H3, H4
Prove the methodsVerification or validation before patient use.n/aM4H5
Daily qualityQC, calibration, and proficiency testing.W5M5H6
Training and competencyEvery tester, every test.W4M6H7
SystemsInterfaces, reports, multi-site comparability.n/an/aH8
Mock inspectionSame checklist as baseline, scored the same way.W6M7H9
Survey and correctionSupport during the survey; plan of correction.If inspectedM8H10
SustainRecurring compliance calendar, monthly re-score.CalendarCalendarCalendar

How we keep it objective

Every requirement is graded on evidence, with the same three-point scale, at baseline, at the mock inspection, and every month after.

2
Met

The requirement is in place, the evidence is complete, signed, current, and can be produced in under 5 minutes.

1
Partial

Evidence exists but is incomplete, unsigned, out of date, or takes longer than 5 minutes to find.

0
Not met

No evidence, or the practice is not happening.

Readiness Score = (sum of grades) ÷ (2 × number of applicable requirements) × 100

  • Every requirement is graded on evidence only. A verbal "we do that" is graded 0 until the record is shown.
  • A Critical Control (★) graded 0 or 1 blocks the gate, regardless of the overall score.
  • Gates are signed off by two people: the client's laboratory director and the LabGuard lead specialist.
  • Scores are recalculated monthly and after every survey, PT event, or staff change, and feed the Compliance Health Score on the dashboard.
  • The same checklist is used for the baseline, the mock inspection, and every re-check, so progress is measured against a fixed yardstick.

Where you start

No CLIA number yet

New laboratory

Start at Phase 0. We classify your test menu, file the certificate application, and build every system before the first patient result is reported.

Certificate in hand

Established laboratory

Start with the Baseline Gap Assessment. We grade every requirement, then skip any phase where you already score 2 on every item.

Form CMS-2567 or accreditor deficiency report

Cited laboratory

Start on the Deficiency Rescue track below. The plan of correction clock is running, so it takes priority over everything else.

Deficiency Rescue track

For labs that received a Statement of Deficiencies (Form CMS-2567) from CMS or a state agency, or a deficiency report from an accreditor. CMS expects an acceptable plan of correction within 10 calendar days of receiving the CMS-2567. Accreditor deadlines differ (CAP, for example, allows 30 days), so we confirm your exact deadline on Day 0.

  1. Day 0
    Triage

    Log every cited deficiency with its tag number and deadline. If any finding is immediate jeopardy, the director decides the same day whether affected testing must stop and whether issued results need review or correction.

  2. Days 1–3
    Root cause

    One root-cause analysis per deficiency (what failed: the process, the training, the record, or the oversight). We look for every other test, instrument, or employee with the same gap, not only the one the surveyor found.

  3. Days 3–7
    Write the plan

    Each correction states: (1) what was done for patients affected, (2) how other affected tests or patients were identified, (3) the system change that prevents a repeat, (4) how it will be monitored and by whom, and (5) the completion date.

  4. By the deadline
    Submit

    The director reviews and signs. LabGuard checks every item against the five elements above before it goes out.

  5. Days 10–60
    Prove it

    Collect evidence of correction (records, signed training, revised SOPs, monitoring logs) in the platform so it is ready for the follow-up visit or document review.

  6. Day 60 onward
    Re-baseline

    Run the full Readiness Score again, then return to your tier's roadmap at the right phase.

Common questions

Is LabGuard a CLIA consultant, an accreditor, or software?

Software plus compliance specialists. We help you prepare, organize evidence, and stay current. We do not issue certificates or accreditation. Those come from CMS, your state agency, or an approved accreditation organization such as COLA, CAP, or The Joint Commission.

Is the specialist work extra?

No. Every task marked Specialist on a roadmap, such as preparing your CMS-116, the mock inspection, and drafting a plan of correction, is included in Essentials, Professional, and Enterprise. Enterprise adds dedicated onboarding and a monthly call.

Can you guarantee we will pass?

No one honestly can. Surveyors grade what they find on the day. What we guarantee is the method: every requirement graded on evidence, every critical control closed before we tell you that you are ready, and the same yardstick used every time.

Who is responsible for compliance?

Under CLIA, the laboratory director is. LabGuard does the work of finding gaps, drafting documents, tracking deadlines, and checking evidence. The director reviews, approves, and signs.

What if our test menu changes?

Add the test in the platform. It is classified (waived, moderate, or high complexity), and if it moves you up a tier, we start the next roadmap from the phase that applies. New non-waived tests always need verification or validation before the first patient result.

Do the timelines include waiting for CMS or the accreditor?

No. Our week counts cover the work we and you control. Certificate processing, fee payment, and survey scheduling are set by CMS, the state agency, or the accreditor.

Does this replace our state's requirements?

No. CLIA is the federal floor. Several states add licensure or stricter rules, and New York and Washington run their own CLIA-exempt programs. Phase 0 identifies which state rules apply to you.

Find out where your lab stands today.

Start with a baseline Readiness Score. Same checklist, same scoring, every time.